The electricians were the first of the tradies to start work here. We've come up with a huge list of things to do;
- safety switches on all circuits
- surge protectors on two of the three phase power
- over wire energy monitor
- hot water moved to the second phase leaving only the air conditioner using the third phase
- biocycle alarm system fixed
- replace fan / light combos
- LED down lights in the kitchen
- replace internal lights with oyster LED lights
- replace external lights with up / down and spotlight LED lights
- LED light for driveway on timer for reversing cars
- single outlets to doubles
- move outlets and switches
- new doubles and switches
- all new wall plates
- CAT6 network cabling from study to family, lounge x 2, main bedroom and a spare for future wireless access point in the hall
- speaker cables for side and rear speakers in the lounge
 |
Cool and cosy means 'hot work and
tight' for electricians |
 |
| Fan down! |
 |
| Wiring hide and seek |
I'm not sure Julie knows what to expect in terms of mess...