Thursday, 31 December 2015

We Found (the) Water!

The water main is the first casualty of war.  We were digging the second last hole for the 150 mm posts when the crowbar which was attacking a root, nicked the side of the water main.  Great timing at 3.30 pm on New Years Eve.  While it took several calls, we were able to have a plumber come out and rectify the situation.

We couldn't have hit it better
if we'd tried

It didn't stop us from digging though.  We dug a few more holes for other posts and found the water again.  At least we know where it is now, right beneath our fence line.

Norm in the zone

Monday, 28 December 2015

Leaking Roof

We had the Joyner's over for the afternoon and dinner yesterday and some heavy rain came through.  After they'd left, we discovered a minor leak in the lounge where the new works have been done.  The obvious suspect is the skylight (who in their right mind punches holes in their roof?) which had been opened for the electricians to do their job but after getting up on the roof, there's a long run of old silicone between the sheeting so someone's seen this before.

At least it was somewhere obvious

We were in a hurry to head to Maleny so I had a quick stab and getting some new silicone in there as its seal would have been broken when the roof was lifted.  I'll have another look with Norm when they're down.

It's ruining Michael's plastering!

Thursday, 17 December 2015

Let There Be Light

It took them longer than expected as the roof didn't help but the electrical work is basically done.  All that's remaining is a power outlet that isn't working and the biocycle alarm.  I have to say, and as trivial as it sounds, it's really nice to be using new switches and sockets.  Switches flick with a solid click and the sockets are tight and secure when plugs are pushed in.

That looks better!

The speaker sockets are the banana type which I haven't used to date but am happy to move to when we buy speakers for the system.  I'm really looking forward to using 7.1 speakers and not just the two to date.  Four of the five network ports work, testing the fifth requires getting into the ceiling.  Using the WD TV Live from a wired connection works well.

The biggest improvement is the lighting.  Gone are the warm lights from the fans and in their place are the cool, white lights, which look, err... white.  Everything looks as it should but there's more light.  So much so when all the lights in the lounge are on, the skylights glow like UFO's on the roof!  The down lights in the kitchen are winners and while you feel like you're getting a tan from what's probably an oversized light in the laundry, you can see what you're doing.  We also fixed some of the logic for which fan / light switch operated what.


You can actually see where
you're walking now

Saturday, 12 December 2015

LMN Fencing Co

The Loch and Michael joined Norm and myself this weekend to start fencing the yard.  Once again Norm was the brains of the outfit while the rest of us was cheap labour.  Julz and Norm had sourced wire, posts, gates and other fencing materials the previous day and Norm set out where the main koppers logs would be located.

New Fence on the Block

Loch, Michael and I took turns digging holes, placing logs, banging in star pickets and running three strands of wire.  The dog wire fence mesh was the last to be added.  It was a hundred metre roll and was so heavy.  We managed to run the fencing from the existing fence between the two houses, down to the front for a hard corner and along the front to the opposite corner which we chamfered giving a nicer, softer finish.

This should keep Harry in

All that's left is for me to clip wire ties to hold the mesh to the wire, until we start building the next stretch to the driveway.

Friday, 11 December 2015

Plaster

Michael the plaster was the third guy to visit.  He does a lot of work for Brian and had time to fit our job in.  He had two days to re-sheet the walls, cornices and patch what Julie referred to as "thousands of holes" left by the electricians.

Grey sheeting with plaster highlights


Bigger is better

Thursday, 10 December 2015

Builder

Brian the Builder was the next person to do his thing.  He and his son Adam have left an impression on all of us.  Julz and I are impressed with his workmanship and speed while Harry now mirrors what Brian does like fixing things (banging things), mixing concrete (dirt) and drawing on walls (notes).

There were five things to do;
- build a dwarf wall between the lounge and dining area as the hight difference will be a fall hazard once a lounge suit is put in place
- remove the doors between the main bedroom and lounge
- widen the openings between the living and formal rooms
- poor a concrete step between the dining and lounge
- remove the cupboard at the end of the lounge to allow us to extend the ensuite shower

New dwarf wall framing

In keeping with the theme of the place, we've learnt more things.  The wall at the end of the lounge wasn't plumb.  That's not entirely surprising as you'll rarely find a house that's built exactly square.  Whilst this isn't a significant issue, it did mean that if we tiled the shower with the wall as is, the tiles would end up with unsightly converging lines so Brian fixed this.  Brian also found that the end wall had termite damage rectified previously.  He put in new timber to the left, someone else had replaced the timber in the centre and the timber on the right is original when built.

Young, middle aged and
senior timber

It wasn't the last sign of termites.  The termite guy had pointed out where termites had entered the wall in a few places and we found where they dined.  Some studs were eaten out at the bottom and part way up but nothing of concern.


Some of the termite damage

The other menu item was one of the main load bearing beams.  When the sheeting had been peeled back, the beam was found to have had its support to have been eaten out.  A piece of stud was cut to size and inserted.  It's nice to know that the beam is no longer being supported by what it's meant to be propping up...


Sky hook replacement


Stain-glass window opportunity?

Tuesday, 8 December 2015

Electricians

The electricians were the first of the tradies to start work here.  We've come up with a huge list of things to do;

- safety switches on all circuits
- surge protectors on two of the three phase power
- over wire energy monitor
- hot water moved to the second phase leaving only the air conditioner using the third phase
- biocycle alarm system fixed
- replace fan / light combos
- LED down lights in the kitchen
- replace internal lights with oyster LED lights
- replace external lights with up / down and spotlight LED lights
- LED light for driveway on timer for reversing cars
- single outlets to doubles
- move outlets and switches
- new doubles and switches
- all new wall plates
- CAT6 network cabling from study to family, lounge x 2, main bedroom and a spare for future wireless access point in the hall
- speaker cables for side and rear speakers in the lounge

Cool and cosy means 'hot work and
tight' for electricians

Fan down!

Wiring hide and seek

I'm not sure Julie knows what to expect in terms of mess...

Monday, 7 December 2015

Uncool

"I'm told the aircon works great".  Whilst technically correct, the words of the agent didn't tell the whole story, which was pretty consistent with a lot of the things that were said...

After the success of the aircon during the Melbourne Cup lunch that Julz hosted, we thought we were on a winner.  A few weeks later and we realised that it had some fundamental flaws.  We made the mistake of trying to use the zone control which resulted in the living area losing life support, the lounge getting all of it and the bedrooms unable to be turned off.

The system (which looks as though it came over on the first fleet and uses three phase power) was inspected and serviced shortly after moving in and while it highlighted some minor issues, it didn't identify these issues.  It turns out that the motors for duct control for the two bedrooms were fused and the one for the family room was broken which meant that the air pressure was closing the vent.

We've since had two companies quote for replacement systems (they gave contradictory opinions on whether a modern system would fit in the confined space of our ceiling) and the living vent has been taped open.

Sunday, 6 December 2015

Debricking

In preparation for the first significant work to be done on the place, we removed the bricks from the lounge.  The plan is to remove the random (and originally the only) door between the bedroom and formal lounge, build a dwarf wall between the formal lounge and dining and widen the openings between the living, hall and formal lounge.

When we had a termite guy in earlier, we mentioned that we were going to remove the bricks and he wanted to come back and have a look.  He was concerned that termites could have entered the house between the split level slabs.  Sure enough, he found four or five spots where they had made their way in and up the walls.  He then coated the exposed slab and brick foundations with an anti-termite treatment that sealed the surface.

Anti-termite seal

He felt it was a real 'told you so' moment.  Not for us but he has found many people aren't interested in going to this extent to protect their home.  Personally I think you can't afford not to.  People taking shortcuts, who'd have thought?